PROJECTS


          Jinan West Railway Station is one of the five departure and arrival stations of the Beijing-Shanghai high-speed railway. The station has 18 lines. According to the designed passenger flow, 21.51 million passengers will be sent per year in 2020, 28.07 million per year in 2030, and the maximum number of people who can gather in new stations is 4,000. According to the arrangement of the total construction period of the Beijing-Shanghai high-speed railway, the total construction period of Jinan West Passenger Station Station Building Project is 23 months, and it will be completed by the end of April 2011.
      The main station building covers an area of 62,534 square meters, with 3 floors above ground and 2 floors underground. Among them, the second underground floor is the subway line 1 platform; the first underground floor is the transfer space and equipment room; the first floor is the exit hall, ticket room and other rooms; the second ground floor and the platform level The third floor is flush with the elevated waiting room, mainly for the waiting room, ancillary rooms and some commercial rooms. The station part is divided into 4 floors. Among them, the second underground layer is the subway line 1; the first underground layer is the underground corridor, which consists of urban corridors, outbound channels and taxi lanes; the upper part of the underground corridor is the platform layer; the upper part of the station yard is the elevated waiting room room.
     Our Company supplied steel pipes and other steel products for this station,all products are in high quality and get a compliment.